Kalb Construction completed this 400,000-square-foot tenant improvement project for Shipmonk in North Las Vegas. With 12,000 square feet of new office space integrated into a massive warehouse facility, the build supports both logistics and operations while reflecting Shipmonk’s corporate brand across every detail.
Project Duration:
- Timeline: 5 months
- Completion Date: January 2024
"Kalb brought experience, attention to detail, and strong leadership to every phase of this project. The result speaks for itself. It’s a space that works, grows, and reflects who we are."
Project Highlights
Challenges Overcome
One of the most complex components of this build was cooling such a large space in desert conditions. Kalb coordinated a precision airlift of twenty-nine 1,100-pound evaporative cooling units using a helicopter, completing the lift and installation with safety and efficiency as top priorities.
Schedule Insight
Preplanning and close collaboration with multiple subcontractors kept the mechanical installation on track. The entire project moved forward on schedule, from framing to final finishes, with safety and execution top of mind.
Budget Outcome
Kalb’s proactive coordination with Shipmonk and its design vendors helped avoid costly changes and keep mechanical systems, finishes, and tenant-specific requirements aligned with the approved budget.