Kalb Construction completed a 23,216 square foot tenant improvement for Planet Fitness, transforming an open shell into a fully built-out, high-performance gym. The space includes locker rooms, workout zones, a converted mezzanine, and a specialized circuit room, all tailored to meet the client’s operational and branding needs.
Project Duration:
- Timeline: 4 months
- Completion Date: September 2022
"Kalb managed this project with professionalism from start to finish. Even with setbacks, they kept us informed and delivered a space we’re proud to operate in."
Project Highlights
Challenges Overcome
Removing the existing tile damaged the concrete beneath, requiring additional surface preparation. Overhead electrical work was extensive, and installing the suspended equipment in the circuit room required precision coordination. The mezzanine was converted into a finished storage area to maximize usable space.
Schedule Insight
The project was completed in 4 months. Although unexpected site conditions caused some delays, Kalb kept trade coordination on track and maintained project momentum throughout.
Budget Outcome