Sunset Warehouse
Overview
Kalb Construction partnered with Blak Development to deliver a 16,992-square-foot ground-up warehouse and office complex in the southwest valley. The site features two mirrored buildings, designed as finished shells ready for future tenant improvements, with efficient access, loading, and parking throughout.
Project Duration:
- Timeline: 12 months
- Completion Date: February 2024
"Kalb brought value to every phase of this project. The execution was smooth, and the quality is exactly what we hoped for."
Project Highlights
Challenges Overcome
This two-building development required strategic site planning and phased delivery to allow for early tenant move-in. Kalb coordinated layout, paving, and infrastructure to ensure each space was fully accessible and functional at turnover.
Schedule Insight
The project was completed in 12 months. By maintaining clear sequencing and early trade coordination, Kalb stayed on schedule while completing full site improvements and vertical construction.
Budget Outcome
Delivered on budget, the project benefited from consistent trade communication and simplified material staging. The tilt-up construction method and standardized build helped reduce costs without sacrificing quality.